Projects
Changes I led on real sites, told as short cases: what was wrong, what we did and what the numbers did after (sample).
Selected projects
Two changes I led from first meeting to the Monday after. Each one is a short case with the numbers.

Three sites onto one warehouse system, in one weekend
Northgate ran on paper pick lists and a spreadsheet per site. I led the move to one warehouse system: six weeks of slotting and training, a dress rehearsal, then the switch from Friday 22:00 to Sunday 18:00 (sample).
Result. Dock open on Monday at 06:00; picking errors down from 1 in 180 to 1 in 900 (sample).
Evidence for DA
A night rota the team wrote with me
The Harbour Freight night shift ran on agency cover and goodwill. We mapped the volume hour by hour on a board, and the team chose the shift patterns that covered it (sample).
Result. Agency hours down by a third; sickness absence down from 7% to 4% (sample).
Evidence for ABC

Where each criterion is proved
The six criteria from the sheet on the home page, with the roles and the cases that hold the evidence.
Criterion
Roles
Cases
A
Leads a shift team of 50 or more
Northgate, Harbour Freight
Night shift rota, Warehouse system move
B
Owns a site budget
Northgate
Night shift rota
C
Keeps people safe on a busy floor
Harbour Freight, Riverside Foods
Night shift rota
D
Brings in new systems without closing the dock
Northgate
Warehouse system move
E
Runs a site with automation
Northgate (pilot only)
None yet
F
Leads a move to a new ERP
None yet: course in progress
None yet
Hiring for a role like this?
Send me the person specification. I answer every criterion with evidence, the same way as the sheet at the top of this site, within two working days.