Completed homes
Homes we have handed over in the last two years.

Courtyard house, Fenwick Road
Stage 8 of 8, handover
Handed over March 2025 (sample)
Place
Springfield (sample)
Home
Single storey, 4 bedrooms
Floor area
212 m²
Build
43 weeks on site

Family home, Orchard Rise
Stage 8 of 8, handover
Handed over August 2024 (sample)
Place
Hollins (sample)
Home
Two storey, 5 bedrooms
Floor area
268 m²
Build
46 weeks on site

What you get at handover
- The keys, the occupancy certificate and the stage reports
- A handover file with every appliance manual and paint colour
- A walk-through to show you the meter, the stopcock and the switchboard
- Visits after three and twelve months to fix anything that has settled
Send us the address of your block
Tell us where the land is and what you would like to build. A designer calls you within two working days and books a free site visit: an hour on the block with the person who would draw your home.