How we check the work

Every build stage ends with a check before the next one starts and before you pay.

Checked before it is covered

Each build stage ends with a check, and a payment is due only after it passes.

Before every concrete pour

The engineer checks the steel and the depth of the footings

Stage 4

Frame inspection

An independent inspector checks the frame before anything covers it

Stage 5

Waterproofing check

Roof, windows and wet areas are tested before the plaster goes on

Stage 6

Your walk-through

You walk the house with your supervisor and sign the stage report

Every stage

Final inspection

With you, before the occupancy certificate and the keys

Stage 8

An engineer walking across a finished concrete slab, checking it before the frame goes up

Hold points

A hold point is a moment when work stops until a check is done. On our sites there are three: before the slab is poured, before the frame is covered and before the plaster goes on (sample).

Each check is written up with photos in your stage report, so you can see what is inside the walls of your home.

Send us the address of your block

Tell us where the land is and what you would like to build. A designer calls you within two working days and books a free site visit: an hour on the block with the person who would draw your home.

© 2026 LT-Architecture. Home builder Joomla template by LTheme

Free site visits, Monday to Saturday (sample)

(555) 016-4410

[email protected]

Book a site visit