Back to all demosLT Arch demoDownload LT Arch on ltheme.com

Studio open Monday to Friday, 9:00–17:30 (sample)

Work stages

Six stages from the first visit to handover; you can stop after any of them.

Six work stages

You can stop after any stage and pay only for the work done. Most clients book stages 1 and 2 first.

Stage

What happens

Time

You get

Fee share

1

Brief and site visit

We walk the site with you, measure what is there and write down what you need and what you can spend.

Time

2 to 4 weeks

You get

A measured survey and a written brief

Fee share

5%

2

Concept design

Two or three ways to arrange the building, drawn and modelled, then the one we develop with you.

Time

4 to 8 weeks

You get

Sketch plans, a card model, a first cost check

Fee share

15%

3

Planning

Drawings and reports for the planning application. We talk to the planning officer and answer the questions.

Time

8 to 13 weeks for a decision

You get

Planning drawings, the application

Fee share

20%

4

Technical design

Drawings and a specification the builder can price from and build from, and the building regulations application.

Time

6 to 10 weeks

You get

Construction drawings, specification

Fee share

30%

5

Tender and contract

We send the drawings to three or four builders, compare the prices line by line and prepare the contract.

Time

4 to 6 weeks

You get

Tender report, a signed building contract

Fee share

5%

6

On site to handover

Site visits every week or two, answers to the builder’s questions and a check of the work before each payment.

Time

The length of the build

You get

Site reports, certificates, as-built drawings

Fee share

25%

Times and fee shares (sample).

Questions

Do I need planning permission?

Many single-storey rear extensions and some loft rooms do not, within size limits; new houses, conversions and anything on a listed building or in a conservation area do. At the first site visit we look at the planning history of your address and tell you which route applies.

How much will it cost to build?

We give a first cost per square metre at the site visit and a proper cost check at the end of concept design, before you spend on planning drawings. Builders’ prices come in at tender; we compare them line by line.

Can you recommend a builder?

We send the drawings to three or four builders we have worked with or that you know, and compare their prices. You choose the builder; the contract is between you and them.

How long does a project take?

An extension usually takes 8 to 12 months from the first visit to the end of the build, a new house 14 to 20 months. Planning decisions take 8 to 13 weeks of that.

Do you work on listed buildings?

Yes. Two of our architects have worked on listed houses and chapels (sample). We prepare the heritage statement and talk to the conservation officer early.

Send us the address and an idea

Tell us where the site is and what you would like to build. We reply within three working days and offer a first site visit: two hours with the architect who would draw your project.

© 2026 LT-Arch. Architecture Joomla template by LTheme

Studio open Monday to Friday, 9:00–17:30 (sample)

(555) 014-2290

[email protected]

Book a site visit